preparing concrete footings
-
preparing airplane hangar concrete foundation
-
pouring airplane hangar concrete slab
-
erecting airplane hangar
-
airplane hangar steel building frame construction
-
interior finishes of airplane hangar
-
large clear span for airplane maintenance
-
interior of pre-engineered metal airplane hangar
-
bi-fold door lift system
-
65' bi-fold door opening
-
large bi-fold door for airplane entry
-
interior of completed airplane hangar
-
exterior of airplane hangar
-
concrete parking lot
-
concrete stairs and flatwork
-
exterior of airplane hangar construction project
-
exterior of steel airplane hangar
-
exterior of completed airplane hangar construction project
-
airplane hangar construction
Midwest Avionics
Project Summary
The owners of Midwest Avionics and their flight school, Summit Flight Academy, purchased a pre-engineered metal building through another vendor. They reached out to Koehn Building Systems to erect the airplane repair hangar.
There were several hurdles to overcome on this complex project. A geotechnical report and civil work had been completed several years earlier, and the owner was concerned about potentially high sitework costs. The owners had attempted to move forward with this project in the past, but it consistently exceeded their budget.
With a very tight budget and significant sitework risk, Koehn Building Systems and the project team were able to value-engineer the scope, assemble the right partners, meet all company standards and project requirements, and ultimately deliver a successful sitework approach.
Scope of Work
Phase 1 - Design Contract
Koehn Building Systems led the design phase. Putting together the team that included architectural, structural, MEP and civil engineers. Upon completion of design and approval that met all permit requirements, Koehn Building Systems then worked up hard costs for construction.
Phase 2 - Construction Contract
This was essentially a Design-Build project with Koehn Building Systems serving as the General Contractor. Koehn Building Systems subbed out site work, electrical, HVAC, plumbing, asphalt, and interior framing and finish.
Project Specifications and Products Used
Pre-engineered Metal Building
The owners purchased the metal building package and bi-fold door via a separate vendor with the following specifications:
- 120’ wide x 100’ long with 22’ eave height
- 8’ liner panel
- Bi-fold door- 65’ x 18’
- 2 - 9’ x 7’ insulated overhead doors
Insulation Package
- Walls - 4’’ blanket insulation (R-13)
- Roof - Simple Saver system (R-35)
Concrete Services
- Foundations
- Piers
- Concrete building slab
- Concrete steps
- Exterior concrete paving
Interior Finishes
- 2 - unisex restrooms
- Break room area (there are cabinets and an open layout break area instead of an enclosed room)
Project Location
Lee’s Summit, MO – at the Kansas City-Lee’s Summit Regional Airport
Start Your Next Construction Project with Koehn Building Systems
If you want to learn more about working with our construction company or are ready to get a quote, we encourage you to reach out to us by calling us at 417-395-4305 or by filling out our contact form online. We promise to reach back out as soon as possible, and the majority of quotes are delivered within 1-2 weeks of our initial project scope conversation. We appreciate the opportunity of working with you and look forward to hearing from you soon.