steel supports for metal building
-
installing steel building supports and columns
-
metal gym being erected
-
aerial view of metal gymnasium being constructed
-
aerial view of two pre-engineered metal buildings
-
entry doors and supports for metal building
-
exterior of steel gymnasium building being installed
-
showing tie in of two different pre-engineered metal buildings
-
guttering system for steel building
-
entry doors to new gymnasium
-
completed school gymnasium construction project
-
entry to completed school gymnasium
Fordland School Gymnasium
Project Summary
Koehn Building Systems worked with a third-party general contractor on this Fordland School gym project. This was a multiple building project, with building A being the gym, and building B serving as the entry. Existing conditions played a major part in the support and detail needed both up-front and throughout the construction phase.
Our scope of work included supplying and erecting the pre-engineered metal buildings.
Project Specifications and Products Used
Pre-engineered Metal Buildings
Building A
- 136’ 5” x 119’ ½” x 40’ eave height, (at high eave)
- Single Slope
Building B
- 17’ 1” x 52’ 6”
- Single slope with parapet wall
- Standing seam roof
Insulation Package
- Roof- Simple Saver banded system (R-38)
- Insulated panels on the walls (R-24)
Project Location
Fordland, MO
Start Your Next Construction Project with Koehn Building Systems
If you want to learn more about working with our construction company or are ready to get a quote, we encourage you to reach out to us by calling us at 417-395-4305 or by filling out our contact form online. We promise to reach back out as soon as possible, and the majority of quotes are delivered within 1-2 weeks of our initial project scope conversation. We appreciate the opportunity of working with you and look forward to hearing from you soon.
Content Reviewed by Steve Koehn