Skip to main content

Fordland School Gymnasium

Project Summary

Koehn Building Systems worked with a third-party general contractor on this Fordland School gym project. This was a multiple building project, with building A being the gym, and building B serving as the entry. Existing conditions played a major part in the support and detail needed both up-front and throughout the construction phase.

Our scope of work included supplying and erecting the pre-engineered metal buildings.

Project Specifications and Products Used

Pre-engineered Metal Buildings

Building A

  • 136’ 5” x 119’ ½” x 40’ eave height, (at high eave)
  • Single Slope

Building B

  • 17’ 1” x 52’ 6”
  • Single slope with parapet wall
  • Standing seam roof

Insulation Package

  • Roof- Simple Saver banded system (R-38)
  • Insulated panels on the walls (R-24)

Project Location

Fordland, MO

Start Your Next Construction Project with Koehn Building Systems

If you want to learn more about working with our construction company or are ready to get a quote, we encourage you to reach out to us by calling us at 417-395-4305 or by filling out our contact form online. We promise to reach back out as soon as possible, and the majority of quotes are delivered within 1-2 weeks of our initial project scope conversation. We appreciate the opportunity of working with you and look forward to hearing from you soon.

Content Reviewed by Steve Koehn