Skip to main content

Christian Learning Center

Project Summary

Koehn Building Systems partnered with Arck Construction, the general contractor, on this project. We supplied and erected the Pre-Engineered Metal Building (PEMB). The project required careful upfront detailing to accommodate the perimeter block wall, and Koehn Building Systems assisted with gym equipment locations, special requirements, and necessary bracing.

Close coordination on the construction schedule was essential, especially with the masonry block wall being built around the perimeter. As with any tie-in project, existing conditions posed challenges, but the team navigated them well and the final outcome turned out great!

Our scope of work included supplying and erecting the pre-engineered metal building.

Project Specifications and Products Used

Pre-engineered Metal Building

  • 100’ x 100’ x 24’
  • 1:12 roof slope
  • Standing seam roof

Insulation Package

  • Wall - 4” blanket (R-13)
  • Roof - 6” blanket (R-19)

Project Location

Fort Scott, KS

Start Your Next Construction Project with Koehn Building Systems

If you want to learn more about working with our construction company or are ready to get a quote, we encourage you to reach out to us by calling us at 417-395-4305 or by filling out our contact form online. We promise to reach back out as soon as possible, and the majority of quotes are delivered within 1-2 weeks of our initial project scope conversation. We appreciate the opportunity of working with you and look forward to hearing from you soon.

Content Reviewed by Steve Koehn