Adrian R-III School District VO-AG Addition and Restroom Renovation

Project Summary

At Koehn Building Systems, we worked with the Adrian R-III school district to construct a new VO-AG addition and restroom renovation.

This public bid project was a challenging project to estimate. Started at the beginning of the pandemic, bidders were not allowed inside the building to complete a pre-bid walk-through due to the unknowns, and instead were provided a video of a walk-through. Our team at Koehn Building Systems worked hard to accommodate existing conditions to reconfigure several of the restrooms, fur out walls, and provide a concrete cut out, new plumbing, and new fixtures and restroom partitions.

Project Specifications and Products Used

New VO-AG Building

  • 50’ x 76’ 8’’
  • 11’ x 50’ structural mezzanine on one end for HVAC equipment
  • Block walls
  • Structural steel bar joists
  • Concealed fastener metal roof
  • IMETCO architectural wall panels
  • Brick veneer

Existing Building

  • Refinish two existing gym floors
  • Major restroom renovations throughout the building
  • New bleachers in one gym
  • New signage on wall and on gym floor
  • New doors and hardware

Interior

  • Plumbing
  • Electrical
  • HVAC

Site Work

  • Site preparation
  • Low volume fill
  • Finish grade
  • Prep for seeding
  • Seeding and mulching

Concrete Services

  • Piers
  • Foundation
  • Slab
  • Exterior concrete
  • Concrete deck on mezzanine

Project Location

Adrian, MO

Start Your Next Construction Project with Koehn Building Systems

If you want to learn more about working with our construction company or are ready to get a quote, we encourage you to reach out to us by calling us at 417-395-4305 or by filling out our contact form online. We promise to reach back out as soon as possible, and the majority of quotes are delivered within 1-2 weeks of our initial project scope conversation. We appreciate the opportunity of working with you and look forward to hearing from you soon.